RFP Objective and Business Context
Establish dual-source capability for high-cavitation ABS stackable crate molds meeting retail distribution stacking loads and dimensional repeatability. ABS shrinkage of 0.4β0.7% demands cavity-by-cavity compensation to ensure consistent nesting fit across 8β12 cavity configurations. Stack mold architecture (modular two-plate construction) enables parallel production, reducing cycle time to 6β8 minutes per shot while maintaining wall thickness uniformity (1.5β3 mm typical for crate ribs and sidewalls). Procurement targets molds qualified for 220β260Β°C melt processing, with documented thermal stability and ejection repeatability over 500,000+ cycles. Secondary objective: establish redundant supply relationships to eliminate single-point molding dependency and enable rapid capacity scaling.