Baseline Definition and Benchmark Scope
This benchmark covers PC logistics basket molds produced for Middle East markets, with wall thickness typically 1.5β3.5 mm to balance structural rigidity and optical clarity. PC's high impact strength and optical properties make it suitable for visible logistics containers, though poor solvent resistance limits chemical exposure. Baseline scope includes mold costs (tooling and machine depreciation), material consumption (density 1.20 g/cmΒ³), and regional lead-time norms. Cycle time expectations for PC basket molds range 45β90 seconds depending on wall thickness and cooling requirements. Mold cavity count (1β4 cavities) and production volume (50,000β500,000 units annually) define cost allocation. This benchmark excludes secondary operations, assembly, and logistics beyond mold delivery.