Baseline Definition and Benchmark Scope
This benchmark covers PC basket molds for logistics applications in Middle East markets, defining performance across mold cavity count (1β16 cavities), part weight (200β2000 g), and wall thickness (1.5β4 mm). PC's melt-temperature range of 280β320Β°C and shrinkage of 0.5β0.7% establish tight tolerances for basket geometry. Baseline metrics include injection pressure (80β120 MPa), cooling-time targets (20β45 seconds per cycle), and mold-steel grades (P20, H13). Scope excludes multi-material or insert-molded variants. Quality thresholds: dimensional tolerance Β±0.3β0.5 mm, surface finish Ra 1.6β3.2 Β΅m, and zero flash on parting lines. Regional lead-time baseline: 10β14 weeks from order to first article inspection (FAI).