Baseline Definition and Benchmark Scope
This benchmark covers ABS injection-molded checkout baskets produced in Southeast Asia (Thailand, Vietnam, Malaysia). Scope includes molds with wall thickness 1.5β3 mm, cavity counts 2β8, and shot weights 200β800 g. ABS density 1.03β1.06 g/cmΒ³ and flexural modulus 2.1β2.8 GPa define structural rigidity for basket load-bearing. Baseline assumes cavity-balanced gating, standard cooling circuits, and post-gate trimming. Quality gates: dimensional tolerance Β±0.1β0.15 mm (leveraging ABS tight tolerance capability), surface finish Ra 1.6β3.2 Β΅m, and visual defect rejection <2%. Lead-time baseline: 8β12 weeks mold build, 2β4 weeks first-article sampling.