Baseline Definition and Benchmark Scope
PE checkout basket molds are single-cavity or multi-cavity tooling (typically 2β4 cavities) designed for structural rigidity despite PE's inherent low stiffness. Wall thickness ranges 2β5 mm; thinner walls reduce cycle time but demand tighter mold tolerances to prevent warping. Mold processing temperature: 180β230Β°C. Standard European lead-time baseline: 8β12 weeks for tool build and first-article sampling. Scope includes cavity design, gating strategy (center hot-tip or edge gate), ejection systems (stripper ring with pneumatic actuation standard), and thermal management for PE's 2β3% shrinkage compensation. Benchmarks exclude secondary finishing (ENP, flash chrome) unless specified. Multi-cavity configurations extend lead-time by 2β4 weeks due to cavity balancing complexity.