Baseline Definition and Benchmark Scope
PE cold-chain crate molds in Southeast Asia are defined by cavity counts of 1–4, wall thicknesses of 2–5 mm, and production volumes of 100k–500k units annually. Baseline mold cost ranges from $8,000–$18,000 USD for single-cavity tooling, scaling to $22,000–$45,000 for multi-cavity configurations. PE's density of 0.94–0.97 g/cm³ and flexural modulus of 0.6–1.4 GPa establish structural limits; crate walls must resist stacking loads without reinforcing ribs that compromise cooling uniformity. Cooling system design—straight-line circuits with O-rings cost 5% cavity premium—directly impacts cycle time and shrinkage control. This scope excludes hot-runner stack molds and valve-gate systems, which exceed typical Southeast Asia regional cost targets.