Baseline Definition and Benchmark Scope
This benchmark covers PE injection-molded cold-chain crates for Southeast Asia, focusing on molds producing crates with 2β5 mm walls and internal rib reinforcement to compensate for PE's lower stiffness versus PP. Baseline scope includes mold cavity count (typically 2β8 cavities), mold base material (steel AISI P20 or hardened aluminum), and cooling system complexity. PE's 2.0β3.0% shrinkage range and excellent chemical resistance define process windows; mold design must account for density variation (0.94β0.97 g/cmΒ³) to ensure consistent wall thickness and dimensional stability post-cooling. Benchmarks exclude secondary operations and reflect standard delivery to Southeast Asia manufacturing hubs.