Baseline Definition and Benchmark Scope
PE backroom-crate molds in European retail typically feature wall thickness 2.5–4.5 mm, shot weights 800–2,500 g, and cavity counts 1–4. Baseline tooling cost ranges €8,000–€22,000 for single-cavity aluminum molds; multi-cavity steel molds reach €35,000–€65,000. Melt temperature windows 200–220°C and PE shrinkage 2.0–3.0% define process stability benchmarks. Crate-specific geometry—interlocking ribs, drainage slots, stacking features—drives mold complexity and lead-time variance. This scope excludes decorative inserts and post-mold assembly; focuses on structural integrity and dimensional consistency for logistics durability.