Baseline Definition and Benchmark Scope
PE nestable-basket molds for European retail are defined by cavity count (4β16), wall thickness (2.5β4.5 mm), and nesting geometry tolerances (Β±0.3 mm). Baseline PE specifications: melt temperature 180β230Β°C, shrinkage 2.0β3.0%, density 0.94β0.97 g/cmΒ³. Mold material is typically P20 or H13 steel with hardness 38β42 HRC. Cycle time benchmarks: 45β75 seconds per shot (including cooling). Gate location and runner balance are critical for uniform wall filling and nest-stack dimensional consistency. This scope excludes colored PE compounds, UV-stabilized variants, and multi-cavity progressive dies. Regional scope covers EU27 + UK molders with ISO 9001 certification.