Baseline Definition and Benchmark Scope
PE nestable-basket molds in the Middle East retail sector are benchmarked for standard wall thicknesses of 2.5–4.0 mm, typical part weights 80–250 g, and cavity counts 4–8 per mold. PE's inherent shrinkage of 2.0–3.0% and flexural modulus of 0.6–1.4 GPa require cavity compensation of +2.5–3.2% to achieve dimensional tolerance ±0.5 mm. Baseline mold steel grade is P20 or H13 with hardness 38–42 HRC. Cooling-line design must accommodate PE's moderate thermal conductivity (0.42–0.50 W/m·K) with water-channel spacing 40–60 mm. This scope excludes post-molding assembly, texture, or multi-material inserts; focuses on single-cavity baseline and regional lead-time norms of 8–12 weeks for tooling.