Decision Context and Winning Criteria
ABS and PP compete directly in rigid and semi-rigid basket applications. ABS excels where dimensional stability matters: melt temperature 220–260°C enables tight tolerances (0.4–0.7% shrinkage), critical for nesting stacks and modular designs. Its flexural modulus (2.1–2.8 GPa) provides structural rigidity without wall thickness penalties—typical ABS baskets hold 1.5–3 mm walls. PP wins when chemical resistance, cost reduction, or impact flexibility dominate. Choose ABS when basket geometry demands precision, stacking stability, or surface gloss finishes (low to ultra-high grades available). Choose PP when cost per unit, chemical exposure (oils, detergents), or lightweight handling drive procurement priority.