Decision Context and Winning Criteria
Choose ABS when dimensional tolerance and surface finish are critical. ABS melts at 220–260°C with shrinkage of 0.4–0.7%, enabling tight basket wall consistency (1.5–3 mm) and gloss uniformity—essential for branded food-contact surfaces. ABS density (1.03–1.06 g/cm³) and flexural modulus (2.1–2.8 GPa) provide structural rigidity for stacking loads. Choose PP when chemical resistance and cost dominate: PP resists oils, acids, and prolonged moisture exposure better than ABS's moderate chemical resistance. PP also reduces resin cost by 15–25% and mold cycle time by 10–15%. Evaluate regulatory compliance: ABS meets UL-94 HB (standard) and flame-retardant V0 grades; PP requires additives for equivalent ratings. Volume thresholds favor ABS above 500k units/year due to tighter tolerance hold and lower scrap.