Decision Context and Winning Criteria
Retail basket molds demand impact durability, dimensional stability, and cost efficiency. HDPE excels in low-temperature impact performance and chemical resistance (excellent rating), with flexural modulus 0.8β1.5 GPa and melt processing at 180β230Β°C. PC offers superior stiffness and optical clarity, critical for transparent or semi-transparent basket designs. Choose HDPE when: basket handles require flex-impact resistance, chemical/detergent exposure is high, or cost-per-unit drives procurement. Choose PC when: clarity, higher rigidity (flexural modulus >2.3 GPa), or premium aesthetic finish justifies material cost. Shrinkage tolerance (HDPE 2.0β3.0% vs. PC 0.5β0.8%) directly impacts mold cavity compensation and secondary finishing.