Decision Context and Winning Criteria
PE-vs-PC selection for retail chairs hinges on structural requirements and end-use environment. PE's flexural modulus (0.6β1.4 GPa) suits flexible, impact-resistant seating; PC's superior stiffness supports rigid, load-bearing frames. PE's melt temperature range (180β230Β°C) enables faster cycles and lower energy costs, while PC requires 260β310Β°C, increasing tooling thermal stress. PE's 2.0β3.0% shrinkage demands tighter mold tolerances than PC's 0.5β0.8%. Choose PE when cushioning, chemical exposure, or cost leadership drives value; select PC when structural rigidity, transparency, or premium aesthetics dominate retail positioning.