Decision Context and Winning Criteria
PE vs PP selection for logistics crates hinges on three procurement dimensions: structural rigidity, chemical exposure, and total cost of ownership. PE's flexural modulus ranges 0.6–1.4 GPa, limiting stiffness in large unsupported spans; PP achieves 1.5–2.0 GPa for rigid wall designs. PE excels in chemical resistance and impact retention at low temperatures, critical for food-grade or corrosive-chemical transport. Choose PE when crates require flexibility, chemical compatibility, and wall thicknesses of 2–5 mm with acceptable deflection. Choose PP when logistics demands rigid geometry, higher operating temperatures, or cost-per-unit volume justifies tooling complexity. Shrinkage differences (PE: 2.0–3.0% vs PP: 1.5–2.5%) affect dimensional tolerance stacks and secondary finishing.