System Boundary and Scope Definition
HDPE basket tooling scope encompasses mold cavity design, runner/gate layout, cooling circuit specification, and ejection mechanics. Material boundaries: HDPE density 0.94–0.97 g/cm³ with 2.0–3.0% shrinkage requires cavity compensation and wall thickness uniformity across 2–5 mm sections. Thermal boundaries: melt temperature 180–230°C mandates heater band zoning and coolant flow rates (typically 15–25°C setpoint). Retail scope includes stacking geometry, handle undercuts, and wall draft angles (1.5–2.5° minimum). Cross-functional handoffs: design engineering defines nominal cavity dimensions; tooling specifies shrinkage allowances; process engineering validates gate location and cooling; quality gates confirm dimensional stability and impact resistance at low temperature.