System Boundary and Scope Definition
Define mold lifecycle scope: design, fabrication, first-article production, serial manufacturing, and field performance through 3–5 year agricultural service life. For PP chairs, establish material cost baseline at $0.90/kg density; 40–80 g per seat component yields $0.036–$0.072 material cost per part. Scope includes mold cavity count (2–8 typical for agricultural chairs), cycle time window (15–25 s for wall thickness 2.5–3.5 mm), and post-mold operations (gating removal, UV stabilizer verification). Define cost gates: mold amortization per unit, scrap rate targets (<2%), and field failure cost exposure. Agriculture-specific boundary: outdoor UV exposure requires stabilizer package validation; chemical exposure from fertilizers and soil acids demands PP's excellent acid/base resistance confirmation. Exclude secondary assembly labor; include cooling-line design impact on cycle time compression.