System Boundary and Scope Definition
PP chair-mold material selection encompasses material specification (virgin or regrind ratio), mold cavity design tolerances tied to 1.5–2.0% shrinkage, and process-window definition (220–280°C melt, 40–80°C mold temperature). Scope includes UV-stabilizer package selection—mandatory for retail furniture exposed to showroom or outdoor light—and wall-thickness mapping (1.5–4 mm) to ensure flexural modulus (1.1–1.6 GPa) meets load requirements. Cross-functional ownership: materials engineering defines resin grade and additive package; mold design translates shrinkage into cavity offsets; process engineering locks injection parameters; quality certifies chemical resistance and UV durability per retail standards. Supplier coordination gates material certificates, mold tryout data, and process capability studies before production release.