Baseline Definition and Benchmark Scope
PE basket molds in Southeast Asia are benchmarked for logistics containers requiring wall thickness 2β5 mm, melt processing at 180β230Β°C, and shrinkage compensation of 2.0β3.0%. This scope covers single- and multi-cavity tooling (cavities 4β32) for flexible, chemical-resistant baskets where PE's density (0.94β0.97 g/cmΒ³) and flexural modulus (0.6β1.4 GPa) define structural limits. Baseline includes material cost per kg, mold amortization over part volume, regional labor rates, and tool maintenance cycles. Exclusions: rigid PP alternatives, thermoset composites, and import duties beyond standard tariff bands. Benchmark applies to suppliers within Thailand, Vietnam, and Indonesia manufacturing zones.