Baseline Definition and Benchmark Scope
PE checkout basket molds in Southeast Asia are typically single-cavity or 2-cavity configurations with wall thickness of 2.5β4.0 mm, optimized for PE's lower stiffness (0.6β1.4 GPa flexural modulus) relative to PP. Mold steel grades range from P20 to NAK80, with cavity surface finishes at SPI AβB. Baseline scope covers molds producing 20β40 L baskets with integrated handles, snap-fit features, and drainage holes. PE processing requires melt temperatures of 180β230Β°C and accommodates shrinkage of 2.0β3.0%, critical for dimensional stability in stacked logistics applications. Benchmark population includes molds from 8β15 active Southeast Asia suppliers, stratified by toolroom size and certification level (ISO 13485, IATF 16949).