Baseline Definition and Benchmark Scope
PC basket molds in African retail production target wall thicknesses of 1.5β3.5 mm, balancing structural rigidity with cycle-time efficiency. Baseline assumes single-cavity D2 tool-steel molds with hardened surfaces, 500,000β2,000,000-cycle lifespan. PC's melt-temperature window (280β320Β°C) and 0.5β0.7% shrinkage directly impact gate design and cooling-channel placement. Benchmark scope covers mold cost amortization, machine-hour rates (typically 40β65 USD/hr in African facilities), and material waste at 8β12% for PC. Quality baseline includes dimensional tolerance Β±0.3 mm, surface finish Ra 1.6 Β΅m, and optical-clarity retention post-molding. Regional lead-time baseline: 8β14 weeks from order to first-article inspection.