Baseline Definition and Benchmark Scope
This benchmark covers single-cavity and two-cavity PC basket molds for retail applications in the Middle East region. PC's optical clarity and high impact strength (flexural modulus 2.3 GPa) make it suitable for transparent or semi-transparent basket designs. Baseline wall thickness ranges 1.5β3 mm for structural ribs and 2β4 mm for load-bearing sections. Mold construction assumes D2 tool steel with hardened surfaces and cold-runner or hot-runner configurations. Amortized mold cost per unit factors maintenance coefficient 2.0 over one million cycles. Single-cavity molds cost $8,000β$14,000 USD; two-cavity hot-runner molds range $16,000β$28,000. Cycle time baseline: 45β75 seconds for single-cavity; 50β85 seconds for two-cavity, accounting for PC's melt temperature window (280β320Β°C) and 0.5β0.7% shrinkage compensation.