Baseline Definition and Benchmark Scope
This benchmark defines HDPE stackable crate molds manufactured for African retail logistics networks. Scope includes molds producing crates with 2–5 mm wall thickness, stacking load capacity of 50–100 kg, and nest-stacking geometry optimized for HDPE's 0.94–0.97 g/cm³ density. Baseline part weight ranges 800–1,400 g. Mold cavity count typically 2–4 cavities per shot. Benchmark covers African contract molders and regional tool shops with HDPE processing capability. Quality baseline: dimensional tolerance ±0.5 mm, surface finish Ra 1.6–3.2 µm, no gate flash >0.3 mm. Lead-time clock starts at PO and ends at first article inspection (FAI) sign-off.