Baseline Definition and Benchmark Scope
HDPE stackable-crate molds for retail distribution require wall thickness 2.5β4.5 mm to withstand stacking loads while maintaining dimensional stability across 0.94β0.97 g/cmΒ³ density tolerances. Benchmark scope covers single-cavity and multi-cavity tooling (2β4 cavities typical) with melt-temperature control at 200β220Β°C. HDPE's 2.0β3.0% shrinkage necessitates cavity compensation Β±0.05 mm; flexural modulus 0.8β1.5 GPa ensures structural integrity under repeated stacking stress. African suppliers must demonstrate mold steel hardness 48β52 HRC, cooling-line diameter 8β10 mm, and ejection-pin preload β₯2 tons. Baseline cycle time: 45β70 seconds per shot. This benchmark excludes custom texture or undercut geometries; standard grid-pattern bases only.